Construction Notice – Milling and Paving in Amherstview
GIP Paving Inc. (GIP) has been contracted by Loyalist Township to complete milling and paving on various streets within Amherstview. The streets impacted by this work are listed below. The work is scheduled to commence April 14th, 2025, and be completed by the Summer of 2025. However, weather, and other unexpected delays may extend this timeline.
What Residents can expect:
The scope of work includes curb repairs to fix drainage issues, structure adjustments of both manholes and catch basins and cross fall correction of the road surface. GIP will be milling a portion of the existing asphalt road surface off, and then applying a Stress Absorbing Membrane Interlayer (SAMI) before laying a new coat of top asphalt.
To complete these various repairs driveways and yards will be impacted. GIP will reinstate all driveways and lawns as part of the construction work.
In some locations curb repairs are required in front of driveways. If curb work is required in front of your driveway a member of GIP will be in touch with your household directly prior to work commencing. Residents impacted by this work can expect to not have access to their driveway for a few days while the work is completed but will have on street parking.
Stay tuned to the Township’s website and social media pages for updates on specific impact dates for your street.
Temporary lane closures may be required to facilitate the work. Some traffic delays can be expected. Please note, you may experience a short interruption of access to your driveway (crew members on site can assist).
- Please observe all signs and traffic control personnel directions
- Use CAUTION when driving
- Drive SLOWLY (5km/hr)
We apologize for any inconvenience this may cause and appreciate your patience during the work period.
List of Streets
- McKeown Crescent - Intersection of Speers Blvd and McKeown to the Intersection of Kildare Ave and McKeown April
April 14th, 2025 Construction Starts
- Kildare Ave - 20m West of the Intersection of Clifford St and Kildare to approximately Civic #80 Kildare Ave
May 12th, 2025 Construction Starts
- Kidd Drive - Intersection of Kildare Ave and Kidd Dr. to the Intersection of Green Dr. and Kidd Dr.
May 26th, 2025 Construction Starts
- Clifford Street - Intersection of Kildare Ave and Clifford St to the Intersection of McKeown St and Clifford Street
April 28th, 2025 Construction Starts